R5 Construction Photojournal
|
|
|

9634 @ Berwyn68 viewsConverted Metroliner Cab Car 9634 leading a Keystone on 3 track through Berwyn.redarrow5591
|
|

AMTRAK AEM7AC 917 @ Berwyn58 viewsAEM 7 AC 917 pushing a Keystone on 3 Track through Berwyn tuesday.redarrow5591
|
|

Berwyn Station's mini high and its replacment55 viewsThe movable hand operated lift has been sent to Berwyn to get passengers on and off trains from 2 Track because 1 is down for CT and CWR installation.redarrow5591
|
|

Hand lift at Berwyn51 viewsAn Amtrak hand operated wheelchair lift at Berwyn Station. Since 1 Track is down for CT and CWR, SEPTA needs it to get passengers on and off.redarrow5591
|
|

Hand Lift at Berwyn52 viewsBack view of the replacment lift at Berwyn.redarrow5591
|
|

Looking West at What's Coming116 viewsThese crews aren't playing. 05/11/07 looking west at Paoli. The TLM (track laying machine is about 3/4 of a mile east of this spot.redarrow5591
|
|

Temporary Walkover @ Paoli60 viewsOne of the three temporary 1 Track crossovers that sit overtop of the newly installed concrete ties at Paoli 5/11/07redarrow5591
|
|
|
|
|
|